Product Description
MCD385Y uses new type hydraulic technology, low consumption, large rotary torque, convenient hole transfer . The drilling machine structure is compact, meanwhile the mast has adjustable compensation function.when drilling, the mast supported on the ground, borehole stability is good.
The pile driver is mainly used for micro piling, photovoltaic solar pile drilling, water well drilling, power
plants, open mining ,road building and other rock blasting hole drilling.
Application:
mainly used for micro piling, photovoltaic solar pile drilling, water well drilling, power
plants, open mining ,road building and other rock blasting hole drilling.
Technical Data:
Bore diameter(DTH hammer)(mm)
|
90-300
|
Bore depth(m)
|
20-100
|
Air consumption(m³/min)
|
10-26
|
Air pressure(Mpa)
|
0.7-1.6(medium);1.6-2.46(high)
|
Pipe diameter(mm)
|
76/89
|
For rock(F)
|
6-20
|
Bore diameter(screw)(mm)
|
Max 400
|
Bore depth(screw) (m)
|
0-30
|
Screw pipe diameter(mm)
|
130-400
|
Once promotion(mm)
|
3200
|
Skid pitch(°)
|
120
|
Swinging angle of skid(°)
|
Left and right total 40
|
Boom swing angle(°)
|
Left and right total 50
|
Rotation speed(r/min)
|
0-110
|
Host power(kw)
|
84
|
Climb ability(°)
|
35
|
Dimension(L*W*H)(mm)
|
5300*1970*2620
|
Weight(kg)
|
5800
|
Walk speed(km/h)
|
0-2.5
|
Advantage:
1.MCD385Y hydraulic crawler drill rig, using new type of hydraulic technology, low consumption, large rotary torque, convenient hole deflection .
2.The drilling machine structure is compact,.while the mast has adjustable compensation function.when drilling, the mast supported on the ground, borehole stability is good.
3.MCD385Y hydraulic earth ground screw pile rig has reliable performance, high efficiency, suitable for operating conditions.It also reduce costs and improve the efficiency
4.multi functional ,the drilling rig is mainly used for piling anchor, water Wells,Photovoltaic solar spiral pile, DTH blasting
construction, etc.
Delivery:
1.Our workers will strictly implement our packing system to ensure that the products are not damaged during transportation.
2. There are many modes of transportation to ensure that products reach customers on time.
Delivery Way
|
Delivery Time
|
By air
|
About10-20 days days after leaving the port
|
By sea
|
About20-30 days days after leaving the port
|